Construction and contracting
Progress billing, retention, advances, variations and back-charges, and government project invoicing.
Is my business in scope
Yes. Main contractors, subcontractors, consultants and suppliers invoicing developers, other contractors or government entities are in scope. Building work for an individual homeowner is B2C and excluded. Government clients go live on 1 October 2027; until then use the buyer not onboarded receiver for them.
Typical transactions
| Transaction | Document | Tax category | Flags (BTAE-02) | Receiver | Guide |
|---|---|---|---|---|---|
| Advance or mobilisation payment | 380 | S | 00000000 |
Client TIN | Advance payments |
| Interim payment certificate (progress bill) | 380 | S | 00001000 |
Client TIN | Continuous supply |
| Retention release (when the client becomes liable to pay it) | 380 | S | 00001000 |
Client TIN | Advance payments and retention |
| Approved variation order (extra work) | 383 / new 380 | S | Same as original | Client TIN | Debit note |
| Back-charge or omitted work | 381, reason DL8.61.1.C |
S | Same as original | Client TIN | Credit note |
| Ministry or government authority project | 380 | S | 00001000 |
Entity TIN or 0235:9900000098 |
B2G |
| Subcontractor billing a main contractor | 380 | S | 00001000 |
Contractor TIN | Standard B2B |
| Self-billing by the main contractor (if agreed) | 389 | S | 00000000 |
Subcontractor TIN | Self-billing |
Most construction services are standard-rated. Some work on qualifying charitable or residential buildings may be treated differently. Confirm with your tax advisor.
Progress billing and retention
Each certified IPC is an e-invoice for the value certified in that period. MoF Guidelines V2.0 Appendix 5 covers advance payments and retention:
- Advance or mobilisation payment: e-invoice it when received. When the advance is recovered, each later invoice reflects only the amount outstanding after deducting the advance, and references the advance invoice. Allocate the recovery to the lines it relates to, or spread it in a reasonable, agreed way that does not change the VAT treatment. Do not add a negative advance line. The paid amount field (IBT-113) can be left blank.
- Retention: one accepted practice is to e-invoice the IPC amount after deducting the retention, then issue a separate e-invoice for the retained amount when the client becomes liable to release it (§17.2). The retention calculation can sit on a separate commercial document rather than on the e-invoice (§10.4, scenario 5). Your existing contract practice can continue if it complies with VAT and e-invoicing rules.
Confirm the approach with your tax advisor and raise a ticket so we can match the set-up.
Watch-outs
- Changing a sent invoice after the consultant re-certifies. Use a credit note or debit note.
- Credit note without the original invoice reference (IBR-055-AE) or approved reason code (IBR-158-AE).
- Continuous supply without billing frequency, or
OTHwithout a note (IBR-160-AE). Monthly IPCs useMTH. - Government invoices missing PO, contract or tender reference (IBT-010 / IBT-012 / IBT-017). They pass validation but are returned commercially.
- Payment due date missing while an amount is payable (IBR-127-AE).
- Unit codes. Use
MTR,MTK(square metre),MTQ,TNE,HUR,DAY,EAorC62(one, for lump sums).LS,SQMandNOSare invalid.
Checklist
- Store contract reference, PO and project code on every contract.
- Configure IPC invoices with continuous supply, period and frequency.
- Agree retention and advance handling with your advisor (Guidelines V2.0 Appendix 5).
- Invoice only the outstanding amount when recovering advances (Appendix 5).
- Route variations to debit notes and back-charges to credit notes.
- Identify government clients and their go-live date.