Document status explained
What each invoice status and tax-reporting status means, and which ones need action.
Invoice status
| Status | Meaning | Action |
|---|---|---|
| Draft | Saved with Mark Draft, not sent | Open, finish and transmit |
| Pending Review | Waiting for an approver | Approve or edit |
| Processing / Sent | Accepted by your ASP and on its way | None, wait |
| Delivered | The buyer's ASP received it and confirmed | None |
| Accepted / Approved | The buyer confirmed it in their system | None |
| Tax Reported / Reported | Sent to a predefined receiver and reported to the FTA | None. Correct result for deemed supply, exports without Peppol ID and buyers not on the network |
| Rejected | It reached the buyer's ASP, which found a rule failure | Read the reason, fix the data and send the corrected document. A rejected transmission reference cannot be reused, so each resend gets a new one |
| Failed | It never reached the buyer's ASP (network, certificate or lookup problem) | Most causes retry automatically; if it stays failed, raise a ticket |
| Received | An inbound invoice from a supplier | Review it |
| Archived | Kept for record retention | None |
Delivered and Tax Reported are both successful outcomes.
Tax reporting (TDD) status
Each document also carries a status for its report to the FTA.
| TDD status | Meaning | Action |
|---|---|---|
| Pending / Submitted | Report being sent / sent to the FTA | None |
| Retry Scheduled | Temporary failure | None, the platform retries |
| Withdraw Pending | The buyer's ASP rejected the invoice, so the report is being withdrawn automatically | Fix and resend the invoice |
| Failed / C5 Timeout | The report could not be completed | Raise a ticket. Your invoice delivery is not affected |
FTA responses: AB accepted, AP approved, IP in process, RE rejected.